Normative documents on the areas of supervision. Teplopromservis - Boiler Supervision Objects Documents establishing requirements for control objects


and supervision of lifting facilities

Manufacturing Supervision Instructions,
installation and repair of boiler supervision facilities

(RD 10-235-98)

1. General provisions

1.1. The instruction establishes the procedure for supervision carried out by the Gosgortekhnadzor of Russia and its bodies over compliance with the rules for the manufacture, installation, repair and reconstruction of steam and hot water boilers, pressure vessels, steam and hot water pipelines registered with the Gosgortekhnadzor of Russia (hereinafter referred to as boiler supervision objects) ) one .

_________

1 The main terms and definitions used in the instructions are given in the appendix.

1.2. Bodies of Gosgortekhnadzor of Russia:

1.2.1. Issue licenses to enterprises and organizations (hereinafter referred to as organizations) for the manufacture of boiler supervision objects, their parts and assembly units installed on them control and safety automation.

1.2.2. Issuing installation licenses to organizations , repair and reconstruction of boiler supervision facilities.

1.2.3. They control the production of prototypes of boiler supervision objects.

1.2.4. Participate in acceptance testing of prototypes of boiler supervision facilities.

1.2.5. Issue permits for serial production of boiler supervision objects.

1.2.6. Participate in periodic, typical , qualification tests of mass-produced objects of boiler supervision.

1.2.7. They participate in the certification of boiler supervision facilities and certification of production facilities in the manner prescribed by the Gosgortekhnadzor of Russia.

1.2.8. Monitor compliance with the terms of validity of issued licenses and permits, compliance with the requirements of rules and regulations technical documentation(NTD) in the manufacture, installation and repair of boiler supervision facilities by manufacturing organizations, installation and repair organizations.

1.2.9. They control the elimination by manufacturing organizations, repair and installation organizations of identified shortcomings in the design of boiler supervision facilities, defects in manufacturing, installation or repair.

1.2.10. Supervise the preparation and periodic testing of knowledge of managers and specialists, quality control inspectors, welders and non-destructive testing specialists associated with the manufacture, installation, repair, reconstruction of boiler supervision facilities.

1.3. For the installation of boiler supervision objects delivered assembled, permission from the Gosgortekhnadzor of Russia is not required. Delivered assembled include objects, the installation of which and piping, as well as the installation of fittings, safety equipment and instrumentation are carried out without the use of welding, soldering or heat treatment of elements that are under pressure during operation.

2. Obtaining by organizations of licenses for the manufacture, installation, repair, reconstruction of boiler supervision facilities

2.1. Organizations engaged in the manufacture, installation, repair and reconstruction of boiler supervision facilities must have a license from the Gosgortekhnadzor of Russia, issued in accordance with the approved Gosgortekhnadzor of Russia on 03.07.93, and the Guidelines for issuing special permits (licenses) for activities related to ensuring safety objects of boiler supervision and lifting structures (RD 10-49-94), approved by the Gosgortekhnadzor of Russia on 31.01.94.

3. The procedure for exercising control over the manufacture of a prototype (pilot batch) of a boiler supervision facility

3.1. Before starting the production of a prototype (pilot batch) of a boiler supervision facility, the organization must submit the following documents to the Gosgortekhnadzor body of Russia:

a) project of the boiler supervision facility;

b) technical specifications for the manufacture of the boiler supervision object;

c) terms of reference drawn up and approved in accordance with GOST 15.001;

d) a certificate of availability in the organization of developed technological processes and equipment necessary for the manufacture of the boiler supervision object in accordance with these processes;

e) program and test method for the prototype.

3.2 . The Gosgortekhnadzor of Russia considers the submitted materials, paying particular attention to:

a) compliance of the prototype with the technical specifications, rules and specifications;

b) equipment of the prototype with instrumentation and means of automation and protection;

c) the level of mechanization;

d) serviceability;

e) maintainability;

f) ease of transportation and installation;

g) scope, frequency and methods of technical examination.

3.3. Based on the results of the review, the Gosgortekhnadzor body of Russia sends its comments and suggestions to the organization in writing.

3.4. Gosgortekhnadzor of Russia, if necessary, conducts a survey of the organization that has begun testing the prototype.

3.5. The organization in the operating instructions must indicate the frequency and scope of control of the prototype (pilot batch), which should be carried out by its owner, and the frequency of information that he should send to the manufacturer.

4. Acceptance testing of a prototype (pilot batch) of the boiler supervision facility

4.1. Acceptance tests of a prototype (pilot batch) are carried out in accordance with GOST 15.001 . Gosgortekhnadzor of Russia allocates its representative to participate in the work of the commission.

4.2. The organization is obliged to notify the representative of the Gosgortekhnadzor of Russia about the upcoming tests of the prototype at least 15 days before the start of the work of the commission and submit the following documents: a copy of the permit for the manufacture of the prototype; drawings of a general view of the boiler supervision facility; test program and methodology ; draft specification or standard of technical specifications; terms of reference approved in accordance with GOST 15.001 ; instructions for installation and operation; a sample of the passport of the object.

4.3. During preliminary acquaintance with the prototype and technical documentation, it is necessary to pay special attention to the compliance of the prototype with the requirements set forth in this manual.

4.4. Generalized proposals and comments received during the preliminary review are submitted by a representative of the Gosgortekhnadzor of Russia for discussion by the acceptance committee. If necessary, specialists who participated in the preliminary review may be involved in the work of the acceptance committee.

4.5. If safety is not ensured during the test service personnel, the representative of Gosgortekhnadzor of Russia suspends the tests until the conditions ensuring the safety of further tests are met.

4.6. If the representative of Gosgortekhnadzor of Russia disagrees with the decision of the acceptance committee, he does not sign the act and the protocol, but attaches to these documents a certificate with a dissenting opinion and an indication, if necessary, of re-testing after the identified deficiencies have been eliminated.

4.7. The signing by a representative of the Gosgortekhnadzor of Russia of an act of an acceptance (state, interdepartmental, departmental) commission means agreement with the Gosgortekhnadzor of Russia of the submitted regulatory and technical documents, including technical specifications.

4.8. The act of the acceptance committee is the basis for considering the issue of mass production of this object.

4.9. In cases where more than one prototype is made, but a pilot batch, tests can be carried out on one sample, and the instructions of the commission to eliminate the identified deficiencies apply to the entire batch.

4.10. The organization is obliged to send these instructions to all owners of the pilot batch samples and take measures to ensure their implementation, as well as make appropriate changes to the design and technological documentation for the newly manufactured object.

5. Obtaining a permit for serial production of a new boiler supervision facility

5.1 . A permit for serial production of a new boiler supervision facility is issued to an organization in the manner prescribed by the Gosgortekhnadzor of Russia.

6. Additional fabrication of non-transportable vessels

6.1. Further fabrication of non-transportable vessels, consisting of enlarged blocks (parts), is carried out at the installation site by the manufacturer or by the installation organization involved by the owner of the equipment, which has a license from the Gosgortekhnadzor of Russia to perform this work. Registration of the documentation required by the rules is carried out by the organization that performed this work.

6.2. An organization performing work on the remanufacturing of non-transportable vessels must promptly (at least one month in advance) notify the body of the Gosgortekhnadzor of Russia, on the territory of which the work on remanufacturing will be carried out, of the start date of these works.

6.3. Control over compliance with the requirements of the rules during the additional manufacture of non-transportable vessels is carried out by the Gosgortekhnadzor of Russia in accordance with this instruction.

7. Control over compliance with the requirements of the rules in the manufacture, installation, repair, reconstruction of boiler supervision facilities

7.1. Control over compliance by organizations with the rules and NTD in the manufacture, installation, repair, reconstruction of boiler supervision facilities is carried out by the Gosgortekhnadzor bodies of Russia by conducting periodic and targeted surveys.

7.2. Periodic inspections of organizations are carried out according to the work plan of the Gosgortekhnadzor body of Russia within the time limits established depending on the level of technological discipline and the quality of products, but at least once every six months.

The survey is carried out in the presence of the chief engineer, the head of the installation or repair work and the head of the QCD (control service) or their deputies.

7.3. Targeted surveys are carried out to check the fulfillment of previously issued instructions or individual specific measures.

7.4. During a periodic inspection, it is necessary to make sure that the documentation listed in is available and that it corresponds to the actual production conditions, and also check:

7.4.1. Availability of complaints and implementation of measures to eliminate identified shortcomings in manufactured, installed or repaired, as well as in previously released, installed or repaired boiler supervision facilities.

7.4.2. Fulfillment of previously issued instructions and instructions of the Gosgortekhnadzor of Russia.

7.4.3. Fulfillment of the conditions of validity of issued licenses.

7.4.4. Compliance of the range of manufactured, installed or repaired objects of boiler supervision with the issued permit.

7.4.5. The performance of the quality control department (control service) of the functions assigned to it for incoming, operational control and acceptance of finished products and the correctness of maintaining the necessary documentation.

7.4.6. Organization of control over compliance with the dimensions and tolerances established by the design documentation.

7.4.7. Organization of control over compliance with the heat treatment regime during bending, stamping, rolling and welding.

7.4.8. Compliance with the requirements of the rules and NTD for quality control of welded joints (external inspection, mechanical tests, metallographic studies, non-destructive testing, hydraulic testing) and the presence of marking of welded joints provided for by the rules and NTD.

7.4.9. Compliance with the order of sorting, cutting and transfer of markings established by the NTD in the process of cutting the source material.

7.4.10. The presence of the marking provided for by the rules and NTD at the boiler supervision facility and its individual parts.

7.4.11. The correctness of the technical examinations of boiler supervision objects provided for by the rules and technical documentation and registration of the results of the examination.

7.4.12. Correctness of filling in passports, installation or repair documentation, availability of applications provided for in the passport form (drawings; strength calculation; passports of safety valves; list and passports of measuring, control, signaling and automation devices; instructions for their operation and instructions for the installation site, if they are supplied together with the object of boiler supervision, etc.), as well as the availability of instructions for installation and operation and the completeness of the information contained in them.

7.5. During the inspection of individual workshops and sections, it is necessary to selectively check the availability of specialists and work certificates (check the training and compliance with the terms of periodic knowledge testing according to the certificates presented).

7.6. In a random survey, it is necessary to make sure that the employees of the enterprise know the rules and regulatory documents related to its activities.

7.7. The representative of Gosgortekhnadzor of Russia has the right to demand from the management of the organization the presentation of the necessary documents and materials related to the manufacture, installation and repair of boiler supervision facilities, and, if necessary, additional tests of individual parts or the object as a whole.

7.8. Based on the results of the survey of the organization, an order is drawn up, which indicates the identified violations of the rules, NTD and the timing of their elimination. It is also necessary to indicate the period during which the organization must inform the body of Gosgortekhnadzor of Russia in writing about the elimination of identified violations.

7.9. Based on the order, the organization should issue an order to eliminate the identified shortcomings and develop measures to prevent them in the future. Copies of these documents are sent by the organization to the body of Gosgortekhnadzor of Russia.

7.10. If during the inspection it is found that the organization repeats the violations noted during the previous survey, or there are new serious violations of the rules, then the work of the site where the violations were detected should be prohibited or, depending on the nature of the violations, should be suspended the validity of a license for the manufacture, installation or repair of boiler supervision facilities.

The organization should issue an order on measures to eliminate the identified violations with the appointment of persons responsible for their implementation, and resolve the issue of the responsibility of those responsible for the violations. After the implementation of these measures, the Gosgortekhnadzor of Russia may consider the renewal of the license for manufacturing, installation or repair.

8. Control over the elimination of design flaws and defects in manufacturing, installation or repair of boiler supervision facilities

8.1. If the Gosgortekhnadzor of Russia during registration, technical examination, inspection of boiler supervision objects, investigation of an accident or accident reveals design flaws, defects in manufacturing, installation or repair, incorrect execution of passports or other violations of the rules and technical documentation committed during the manufacture, installation or repair of boiler supervision objects , then he must inform the organization that performed the relevant work, the territorial body of the Gosgortekhnadzor of Russia that issued the license for the manufacture, installation or repair of this facility, and the Gosgortekhnadzor of Russia.

After receiving the message, the Gosgortekhnadzor of Russia body that issued the license is obliged to immediately demand that the organization eliminate the shortcomings, take measures to prevent them in the future and establish control over the implementation of these requirements.

The body of Gosgortekhnadzor of Russia, which issued the license for the manufacture of the boiler supervision object, must notify the body of Gosgortekhnadzor of Russia, from which the message was received, and Gosgortekhnadzor of Russia about the measures taken to eliminate deficiencies.

8.2. Recommendations prepared by the organization to eliminate design flaws or manufacturing defects at boiler supervision facilities in operation, before being sent to the owners of the facilities, must be agreed with the Gosgortekhnadzor of Russia body that issued the license for manufacturing, installation, repair.

8.3. The Gosgortekhnadzor bodies of Russia periodically control the complaint log, in which organizations enter information about design flaws and manufacturing defects identified during the installation or operation of boiler supervision facilities, and measures taken to eliminate them.

Appendix

The following terms and definitions are used in this manual:

1. Parts and assembly units in this manual mean:

a) for boilers, superheaters and economizers - drums, shells, bottoms, chambers (collectors), tube sheets, panels, screens, blocks (enlarged assembly units and their interconnections), burners;

b) for vessels - bodies, shells, bottoms, covers, tube sheets, body flanges and bottoms of their connection to each other;

c) through pipelines of steam and hot water (within and outside the boilers and vessels) - bends, tees, transitions, compensators, forks, desuperheaters, ROU and BROU pipe elements and their connections to each other.

2. Sub-repair and reconstruction means the repair and reconstruction of boiler supervision facilities, their parts and assembly units using welding, rolling or heat treatment.

3. Installation is understood as installation of boiler supervision objects using welding and rolling.

4. Specialized design organization - a design organization, research institute or plant, one of the functions of which is the design of boilers, vessels or pipelines.

5. Expert organization - an organization (enterprise) that has a permit (license) from the Gosgortekhnadzor of Russia to conduct an examination.

6. Normative and technical documentation (NTD) - state and industry standards, specifications, guidelines (RD, RTM).

7. Licensing of types of activities - issuance of a special permit to organizations for the right to engage in certain types of activities.

For the organization and implementation of technical supervision and maintenance, ensuring the serviceability and safe operation of boiler supervision facilities and lifting structures at the enterprise in accordance with the current rules for the construction and safe operation of these facilities.

I ORDER:

1. Assign to the chief mechanic: cranes and other lifting mechanisms /hoists, etc., including their equipment/, as well as removable load-handling devices, containers, steam boilers, economizers, pressure vessels, steam and hot water pipelines.

2. To supervise the good condition and safe operation of hoisting machines and conduct technical examination, technical inspection of technological transport, safe operation of crane runways, removable load gripping devices, containers, as well as oversee the good condition of the safe operation of pressure vessels, appoint a chief mechanic.

3. Responsible persons for ensuring the good condition of cranes, forklifts, electric hoists and other lifting mechanisms to appoint:

According to the processing shop workshops -

According to the autotransport shop -

In the lower warehouse - mechanics

The above persons to produce periodic inspection removable load-handling devices and containers within the time limits established by the schedule.

4. Appoint a commission to conduct technical inspections of the forklift and diesel loader under the guidance of the ETC technical inspector, conduct technical inspection the above units of equipment - before May 16, 2008.

Chairman of the commission -

Commission members:

5. Responsible persons for the safe performance of work on the movement of goods by cranes to appoint:

For the transport department:

By construction site:

6. Assign cranes to crane operators and slingers, forklift and diesel loader drivers by structural divisions in accordance with Appendix No. 1

Responsible persons for the good condition and safe operation of boilers, economizers, hot water pipelines appoint an energy engineer.

7. Persons exercising technical supervision of boiler supervision facilities / lifting mechanisms, machines, boilers, pressure vessels, compressor units, steam and hot water pipelines / draw up annual and monthly work plans and approve them with the chief engineer of the enterprise, report to him on the progress their implementation.

8. To all responsible persons / heads of workshops, sections / admission to work of personnel servicing boiler supervision facilities and lifting mechanisms, to produce by order / after the conclusion of the medical commission, training, certification, issuance of relevant instructions, magazines, certificates of the established form /.

9. For vacations, business trips, illness and other cases of absence responsible persons appointed by this order, their duties in each individual case to impose on the employees replacing them by position, by the appropriate order for the enterprise.

When duties are temporarily assigned to persons responsible for the good condition and safe operation of facilities, a copy of the appointment order is attached to the facility passport. There is no entry in the passports in these cases.

10. To conduct periodic testing of the knowledge of the service personnel, appoint a commission consisting of:

Chairman of the Commission: Ch. engineer

committee members:

Re-testing the knowledge of service personnel is carried out by this commission:

At least once every 12 months;

During a break in the work of a previously certified worker at other enterprises;

At the request of a representative of the technical administration for supervision or an inspector of boiler supervision.

10. Establish a repair group to carry out preventive maintenance of lifting structures and boiler supervision facilities.

11. To the head of the transport department - to allocate self-propelled jib cranes and an excavator 2621 excavator to organizations, legal entities, individuals - only upon written requests.

12. Cranes should be taken out for repair by persons responsible for maintaining the crane in good condition, in full compliance with the Rules for the Construction and Safe Operation of Cranes.

13. Objects of boiler supervision and lifting mechanisms that are not registered with the Gosnadzorohrantruda inspection should be registered with a representative of the technical administration for supervision.

14. Organize the production of removable load-handling devices in the forestry enterprise. Responsible for the manufacture of removable load-handling devices to appoint the head. workshops.

15. All changes and additions under this order must be made in a separate order with reference to the number of this order.

17. To impose control over the implementation of this order on the chief engineer.

Boiler supervision facilities include:

  • steam and hot water boilers,
  • pipelines of steam and hot water with a working steam pressure of more than 0.07 MPa and a temperature of more than 115 0 С,
  • vessels operating under pressure over 0.07 MPa,
  • electric boilers,
  • pressure chambers.

In the process of manufacturing, installation, operation and repair of pipelines and pipe systems of boilers, vessels and pressure chambers, it is necessary to carry out systematic quality control welding work and welded joints - preliminary control (including input control), operational control and acceptance control of welded joints.

Requirements for the methods, scope and objects of preliminary control, including verification of personnel certification, verification of equipment and apparatus, control of basic and welding materials, as well as requirements for operational control of assembly and welding operations, are set out in the relevant regulatory documents.

Name of control objects

Documents establishing requirements for control objects

1. Objects of boiler supervision:
1.1. Steam and hot water boilers PB 10-574-03
RD 153-34.1-003-01
RD 10-577-03
RD 10-69-94
RD 10-249-98
PB 10-575-03
1.2. Electric boilers PB 10-575-03
PB 10-574-03
RD 10-249-98
1.3. Vessels operating under pressure over 0.07 MPa. GOST 50599-93
PB 03-584-03
PB 03-576-03
RD 03-421-01
1.4. Steam and hot water pipelines with a working steam pressure of more than 0.07 MPa and a water temperature of more than 115 0 С PB 10-573-03
RD 153-34.1-003-01
RD 10-577-03
PB 10-574-03
PB 10-575-03
RD 10-249-98
1.5. Pressure chambers GOST 50599-93
PB 03-584-03
PB 03-576-03
RD 09-539-03
  • 1.3.1 Technical examination of boilers General provisions
  • Checking technical documentation
  • External and internal examinations
  • Vertical water tube and horizontal water tube boilers
  • High pressure boilers 10 MPa (100 kgf/cm) and above
  • Hot water boilers
  • Fire-tube and gas-tube boilers
  • Waste heat boilers
  • Hydraulic test
  • 1.3.2. Technical examination of vessels General provisions
  • Checking technical documentation
  • External and internal examinations
  • Hydraulic test
  • 1.3.3. Technical examination of steam and hot water pipelines General provisions
  • Checking technical documentation
  • External examination
  • Hydraulic test
  • 1.3.4. Registration of the results of technical examination or diagnosis
  • 1.4. Peculiarities of technical surveys of pressure vessels
  • Permissible deviations of ovality and non-straightness of the generatrix of vessel bodies
  • 1.5. Technical examination of hydrolysis apparatuses and sulphite digesters
  • 1.5.1. Features of the design of hydrolysis apparatus
  • And sulfite digesters
  • 1.5.2. Monitoring the technical condition of hydrolysis apparatuses and sulphite digesters
  • Parameters of ultrasonic testing of butt welded joints (according to RD-64-047-87)
  • Parameters of ultrasonic testing of weld joints interfaces (according to RD 64-047-87)
  • Parameters of ultrasonic testing of fillet welded joints along the outer surface of the body (according to RD 64-047-87)
  • The dependence of the angle of inclination of the acoustic axis of the transducer
  • From the ratio of the thickness of the walls of the body and the nozzle with ultrasonic
  • Inspection of fillet welds on the outer surface
  • Branch pipe (according to rd 64-047-87)
  • Schemes of ultrasonic testing of rivet joints and dimensions of reflectors
  • 1.5.3. Assessment of the technical condition of rivet joints
  • 1.6. Features of the technical examination of certain types of pressure vessels
  • 1.6.1. Technical certification of reactors
  • Carbon disulfide production
  • 1.6.2. Technical examination of heat exchangers of oil refining and petrochemical industries
  • 1.6.3. Technical examination of cylinders-vessels
  • 1.7. Additional requirements for testing during the technical examination of vessels and apparatus of air separation units
  • 1.8. In-plant technical supervision
  • 2. Reliability control of metal and welded joints of elements of boilers and pipelines of steam and hot water
  • 2.1. Organization of control of metal of steam and hot water boilers and pipelines of steam and hot water
  • 2.2. Incoming control of metal of thermal power plants with pressure
  • 9 MPa and above
  • The volume of incoming inspection of metal of thermal power plants with a pressure of 9 MPa and above
  • The chemical composition of the metal of pipes supplied according to that 14-3-460-75
  • Mechanical properties of the metal of pipes supplied according to that 14-3-460-75
  • The results of the input control of the metal
  • 2.3. The main methods of quality control of metal and welded joints of boilers and pipelines
  • 2.3.1. Steeloscopy
  • 2.3.2 Tensile tests
  • Recalculation of relative elongation from tenfold to fivefold sample, depending on the relative contraction
  • 2.3.3. Hardness measurements
  • Coefficient values ​​for hardness measurement by comparison method
  • Permissible average values ​​of weld metal hardness after high tempering, MPa
  • 2.3.4. Impact test
  • 2.3.5. Microstructure control
  • 2.3.6. Ultrasonic control
  • 2.3.7. translucence
  • 2.4. General principles for organizing operational control over the state of metal and welded joints of the main elements of boilers, turbines and pipelines of thermal power plants
  • 2.5. Supervision of station pipelines in operation
  • The form for measuring the residual deformation of pipes of steam pipelines and collectors (element diagram, drawing No.)
  • Hardness of fasteners after various periods of operation
  • Results of studies of cuttings from welded joints
  • 2.6. Supervision and control of heating surface coils, culverts, collectors and internal boiler pipelines
  • The main dimensions of the measuring device (mm) depending on the outer diameter and wall thickness of the pipe, mm
  • The minimum allowable nominal wall thickness of the pipe used to replace the bends, depending on the working pressure and the outer diameter of the pipe
  • 2.7. Observation and control of the metal drums of high-pressure steam boilers
  • 2.8. Control of metal elements of boilers and pipelines after reaching the park resource
  • 2.9. Repair of high pressure boiler drums
  • 2.10. Restorative heat treatment of steam pipelines of thermal power plants
  • 2.11. Prevention of ignition of fuel and deposits in boilers in order to protect metal structures from damage
  • 2.12. Methodology for the analysis of damage to the metal of boilers, vessels and pipelines
  • Minimum allowable ratios of temporary resistance at operating temperature to temporary resistance at room temperature
  • 1 Organization of technical supervision over the safe operation of boiler supervision facilities

    1.1. Regulation of issues of ensuring the safe operation of boiler supervision facilities

    State regulatory regulation of industrial safety issues on the territory of the Russian Federation, as well as special permitting, supervisory and control functions, by Decree of the President of the Russian Federation dated February 18, 1993, No. 234, are assigned to the Federal Mining and Industrial Supervision of Russia (Gosgortekhnadzor of Russia).

    Along with other functions, Gosgortekhnadzor of Russia carries out state regulation and supervision in the field of design, manufacture, installation, repair and safe operation of steam and hot water boilers, pressure vessels, pipelines for steam and hot water - boiler supervision facilities, and also monitors compliance with the requirements for safety of the specified equipment at all stages of its life cycle.

    In the field of boiler supervision, the Gosgortekhnadzor bodies of Russia supervise steam boilers, steam pipelines and vessels operating at a pressure of more than 0.07 MPa (0.7 kgf / cm), hot water boilers and hot water pipelines with a heating temperature of more than 115 ° C.

    High pressures and temperatures, corrosive and erosive effects of the working medium on the walls of the equipment, as well as the use of explosive and fire hazardous substances harmful to human health in technological processes determine the increased requirements for ensuring the operational reliability of boiler supervision facilities. Long-term safe operation of the equipment is achieved by fulfilling a set of requirements during its manufacture and operation, which are regulated by the "Rules for the Design and Safe Operation of Steam and Hot Water Boilers", approved by the Gosgortekhnadzor of Russia on May 28, 1993, "Rules for the Design and Safe Operation of Electrode Boilers and Electric Boilers", approved Gosgortekhnadzor of Russia 06/23/1992, "Rules for the Design and Safe Operation of Pressure Vessels", approved by the Gosgortekhnadzor of Russia on 04/18/1995, "Rules for the Design and Safe Operation of Steam and Hot Water Pipelines", approved by the Gosgortekhnadzor of Russia on 07/18/1994 . . These rules are mandatory for all ministries, departments, enterprises, organizations (regardless of ownership) and citizens. The provisions of these rules are specified in regulatory and technical documents (NTD), which, in order to ensure the unity of requirements, are approved or agreed upon by the Gosgortekhnadzor of Russia.

    Regulatory documents define the conditions for high-quality manufacturing, installation or repair of boiler supervision facilities, as well as to ensure their safe operation. The equipment manufacturer or its owner has the right to choose the most effective, based on their capabilities, way of implementing these conditions. At the same time, the industrial safety regulation system provides for granting the right to perform work that determines the safe functioning of boiler supervision facilities only to those enterprises or organizations whose organizational and technical readiness complies with safety rules. Gosgortekhnadzor of Russia regulates supervisory activities through a licensing system. The procedure for issuing licenses for activities related to ensuring safety during the operation of boiler supervision facilities is regulated by RD 10-49-93.

    According to RD 10-49-93, licensing is subject to the following types activities.

    Design of boiler supervision facilities - design of boiler rooms, boilers, pressure vessels, steam and hot water pipelines; development of projects for the reconstruction, modernization and modification of boiler supervision facilities; development of projects for the installation and layout of boiler supervision facilities; development of operational documents (duplicates) for boiler supervision facilities that are in operation.

    Production of boiler supervision objects - production of prototypes of boiler supervision objects; serial, non-serial repetitive and single production of boiler supervision objects; production of membrane safety devices for boiler supervision facilities.

    Repair (reconstruction) of boiler supervision facilities - reconstruction, modernization and overhaul boiler supervision facilities; carrying out restorative heat treatment of equipment of thermal power plants.

    Installation (commissioning) of boiler supervision facilities - installation and commissioning works at boiler supervision facilities and auxiliary equipment; commissioning work on protection systems and safety probes for boiler supervision facilities, including during repair and operation.

    Examination of the safety of boiler supervision facilities, equipment and work at these facilities - conducting an examination (issuance of conclusions) on the organizational and technical readiness of enterprises to carry out a licensed type of activity; technical diagnostics and expert examination of boiler supervision facilities that have completed their standard service life, with the issuance of a conclusion on the possibility and conditions for their further operation; non-destructive testing of metal and welded joints; conducting an examination (with the issuance of a conclusion) of programs and methods for testing and monitoring the state of boiler supervision facilities.

    Training of personnel for boiler supervision facilities - conducting training and testing knowledge of safety rules and standards for managers and specialists of enterprises engaged in licensed activities; training of workers in basic professions; for enterprises engaged in the manufacture, installation, reconstruction, repair, adjustment and maintenance of boiler supervision facilities.

    Operation of boiler supervision facilities - carrying out a technical examination of boiler supervision facilities in cases stipulated by safety rules; operation of boiler supervision facilities.